2024
DOI: 10.3390/en17194838
|View full text |Cite
|
Sign up to set email alerts
|

Asynchronous Injection–Production Method in the High Water Cut Stage of Tight Oil Reservoirs

Jianwen Chen,
Dingning Cai,
Tao Zhang
et al.

Abstract: Asynchronous injection–production cycle (AIPC) in a horizontal–vertical well pattern is an efficient strategy for enhancing water injection in tight reservoirs. However, current studies lack consideration of waterflood-induced fractures (WIFs) caused by long-term water injection. This paper takes block Z in the Ordos Basin, China, as the research object and first clarifies the formation conditions of WIFs considering the horizontal principal stress and flow line. Then, the pressure-sensitive permeability equat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 41 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?