Assessment of the Risk of Damage to 110 kV Overhead Lines Due to Wind

Abstract: The article presents an assessment of the risk of damage to 110 kV overhead power lines as a result of the impact of wind of variable speeds on that equipment. A statistical method for the assessment of the reliability of power structures in conditions of variable strength of the structure and at variable exposure values is presented. This method is based on the analysis of the shape and mutual location of the distributions of the probability density of the momentary resistance (strength) of the tested structu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(8 citation statements)
references
References 11 publications
0
4
0
Order By: Relevance
“…Maintenance costs of the transmission line, including the replacement cost, adjusted maintenance cost, loss of selling cost and loss of penalty fee cost, were determined and subsequently used to multiply with the D-distance risk factor, as shown in ( 8) to (11), which revealed the actual maintenance cost based on actual risk. Finally, the total maintenance cost could be expressed as shown in (12).…”
Section: Cost Analysismentioning
confidence: 99%
See 2 more Smart Citations
“…Maintenance costs of the transmission line, including the replacement cost, adjusted maintenance cost, loss of selling cost and loss of penalty fee cost, were determined and subsequently used to multiply with the D-distance risk factor, as shown in ( 8) to (11), which revealed the actual maintenance cost based on actual risk. Finally, the total maintenance cost could be expressed as shown in (12).…”
Section: Cost Analysismentioning
confidence: 99%
“…By using ( 8) and ( 9), the replacement cost and maintenance cost of TL#1 at the age of 51 years, which were determined by multiplying the D-distance with its relevant cost, were equal to 2396.68 and 368.99 kTHB/km, respectively. Similarly, by using (10) and (11), the loss of sale and reputation cost were equal to 719.85 and 40.30 kTHB/km, respectively. Therefore, the total cost of this line is 3525.83 kTHB/km, which is nearly equal to the investment cost of a new overhead line-3508.28 kTHB/km.…”
Section: Cost Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…Pollution can reduce the insulating performance of power lines, triggering breakdown discharges. Corrosion can reduce the mechanical strength of power lines, affecting their service life [3][4][5][6][7]. These threats require us to take effective preventive and responsive measures.…”
Section: Introductionmentioning
confidence: 99%
“…Most electrical equipment forms an integral part of expansive scientific, technical, and industrial facilities. Electrical equipment's vulnerability to damage significantly impacts the functionality of numerous machines, technical equipment, plants, and industrial sectors [1][2][3][4].…”
Section: Introductionmentioning
confidence: 99%