2016
DOI: 10.1007/s12205-016-0817-6
|View full text |Cite
|
Sign up to set email alerts
|

Assessment of staffing needs for construction inspection

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(6 citation statements)
references
References 3 publications
0
6
0
Order By: Relevance
“…Most recently released classification and segmentation datasets for heavy construction equipment are primarily constructed in 2D images, such as ImageNet [29], the AIM (Advanced Infrastructure Management group (Lake Ariel, PA, USA)) dataset [30,31], the ACID (Alberta Construction Image Dataset) [32], and the Microsoft COCO (Common Objects in Context) dataset [33]. Additionally, research institutions often construct their own data for conducting research [23,34] by collecting substantial image datasets from various sources, including online and offline environments such as construction sites. Consequently, in 2D image-based ML and DL research in the construction industry, there are various methods to easily acquire the necessary datasets for training and testing.…”
Section: Related Work 21 Review Of Classification and Segmentation Da...mentioning
confidence: 99%
“…Most recently released classification and segmentation datasets for heavy construction equipment are primarily constructed in 2D images, such as ImageNet [29], the AIM (Advanced Infrastructure Management group (Lake Ariel, PA, USA)) dataset [30,31], the ACID (Alberta Construction Image Dataset) [32], and the Microsoft COCO (Common Objects in Context) dataset [33]. Additionally, research institutions often construct their own data for conducting research [23,34] by collecting substantial image datasets from various sources, including online and offline environments such as construction sites. Consequently, in 2D image-based ML and DL research in the construction industry, there are various methods to easily acquire the necessary datasets for training and testing.…”
Section: Related Work 21 Review Of Classification and Segmentation Da...mentioning
confidence: 99%
“…Based on survey responses and interviews with domain experts, Yuan [13] prioritized inspection checklist items to optimize resources used for inspection by the Indiana Department of Transportation. With a similar purpose, Kim et al [14] analyzed 1598 projects of the Texas Department of Transportation to estimate their staffing needs and improve the efficiency of construction inspection. By integrating the Analytic Network Process (ANP) and fuzzy set methods, Fan [3] developed a construction quality index model that serves as an objective standard for construction inspections in Taiwan.…”
Section: Literature Reviewmentioning
confidence: 99%
“…More specifically, Li et al (15) found that 46.7% of complex projects from their survey data used consultants. Most STAs hire CEI consultants on longer-term projects to justify the cost of hiring them (5,16,17). Also, Kim et al (16) concluded that more labor/skill/time-intensive projects require more resources.…”
Section: Introductionmentioning
confidence: 99%
“…Most STAs hire CEI consultants on longer-term projects to justify the cost of hiring them (5,16,17). Also, Kim et al (16) concluded that more labor/skill/time-intensive projects require more resources. For example, interchanges and widening projects use significantly more labor than simpler projects, like pavement projects.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation