Assessment of Harmonic Resonances in Third Rail System: A Case Study in Malaysia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(6 citation statements)
references
References 8 publications
0
0
0
Order By: Relevance
“…The 22 kV of power will be distributed along the alignment through the main cable ring network for feeding traction and auxiliary loads. Keeping in view the reliability requirements, two bulk supply substations (BSSs) are proposed to be set up for the line [24][25][26][27][28]. The plan includes one BSS located near the Binh Trieu maintenance depot in Phase 1, and the remaining BSS located near the end station of the PVD line at Gia Dinh Park in Phase 2.…”
Section: Sources Of Power Supplymentioning
confidence: 99%
See 4 more Smart Citations
“…The 22 kV of power will be distributed along the alignment through the main cable ring network for feeding traction and auxiliary loads. Keeping in view the reliability requirements, two bulk supply substations (BSSs) are proposed to be set up for the line [24][25][26][27][28]. The plan includes one BSS located near the Binh Trieu maintenance depot in Phase 1, and the remaining BSS located near the end station of the PVD line at Gia Dinh Park in Phase 2.…”
Section: Sources Of Power Supplymentioning
confidence: 99%
“…Therefore, stricter regulations are needed to deliver power to the subway. The traction power supply system for the MCS generally has the following technical features [12][13][14][15][16][17][18][19][21][22][23][24][25][26][27][28]:…”
Section: Traction Power Substationmentioning
confidence: 99%