2020
DOI: 10.1051/e3sconf/202019201011
|View full text |Cite
|
Sign up to set email alerts
|

Assessment and control of geodynamical risks under the conditions of a rock-bump hazardous complex deposit

Abstract: Research has been carried out to study the peculiarities of rockbump hazards and induced seismic manifestations at the Nikolaevskoe deposit, and their close correlation with the tectonic structure of the rock massif has been established. In order to strengthen control over the rock-bump hazard in the TN-3 high-angle fault, in 2019 the observation network was expanded and continuous seismoacoustic monitoring of the rock mass at the deep levels of Nikolaevskoe deposit was organized. Monitoring data is verified b… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 7 publications
0
0
0
Order By: Relevance