2020
DOI: 10.1007/s10584-020-02909-w
|View full text |Cite
|
Sign up to set email alerts
|

Assessing the past and adapting to future floods: a hydro-social analysis

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

4
24
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1

Relationship

3
5

Authors

Journals

citations
Cited by 31 publications
(31 citation statements)
references
References 42 publications
4
24
0
Order By: Relevance
“…The cross-section survey was conducted in 2014 by the Department of Water Resources and Irrigation (DoWRI), previously the Department of Irrigation. The same cross-section data were used by Devkota et al (2020) while analyzing floods across the study area. The Department of Hydrology and Meteorology (DHM) issues timely flood forecasts for the study basin using the same data by forcing hydrodynamic models, such as HEC-RAS and MIKE.…”
Section: Study Areamentioning
confidence: 99%
“…The cross-section survey was conducted in 2014 by the Department of Water Resources and Irrigation (DoWRI), previously the Department of Irrigation. The same cross-section data were used by Devkota et al (2020) while analyzing floods across the study area. The Department of Hydrology and Meteorology (DHM) issues timely flood forecasts for the study basin using the same data by forcing hydrodynamic models, such as HEC-RAS and MIKE.…”
Section: Study Areamentioning
confidence: 99%
“…Further, a 50-year period flood is a large flood with chances of significant damage -Scenario III. And finally, a 100-year period flood is a very large flood with high likelihood of extensive damage to life and property: it has been modelled as Scenario IV (details of the Scenarios and flood zones are available at Devkota, 2014, Devkota et al 2020.…”
Section: Methodsmentioning
confidence: 99%
“…There were 720 HHs in the three flood risk zones -144 in high; 274 in moderate; and 302 in low. Stratified random sampling with proportion of HH numbers was considered as a basis of allocating the sampling effort in each zone (Devkota et al 2020). Before administering HH survey and FGDs, the questionnaire was pre-tested.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…but also in flood control works [9] [10]. Underestimation of the flows could lead to rejection of attractive projects whereas overestimation could have huge implications on the physical infrastructure and overall economic feasibility of the projects [4] [11]. Accurate flow estimates are, therefore, necessary at these basins where water resources projects are developed.…”
mentioning
confidence: 99%