2020
DOI: 10.1016/j.apenergy.2020.115939
|View full text |Cite
|
Sign up to set email alerts
|

Assessing the cost of the Hazard-Decision simplification in multistage stochastic hydrothermal scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

3
12
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 15 publications
(16 citation statements)
references
References 21 publications
3
12
0
Order By: Relevance
“…Additionally, this sub-optimal policy has detrimental effects on the operation of the system. As reported in [3,10], high operating costs as well as highly volatile thermal generation and distorted spot prices are observed.…”
Section: Assessing the Time Inconsistency Gapmentioning
confidence: 80%
See 4 more Smart Citations
“…Additionally, this sub-optimal policy has detrimental effects on the operation of the system. As reported in [3,10], high operating costs as well as highly volatile thermal generation and distorted spot prices are observed.…”
Section: Assessing the Time Inconsistency Gapmentioning
confidence: 80%
“…In this algorithm, an evaluation process is carried out for specific iterations, namely, K, which are specified by the user. For instance, in [3,5] and [10], K = {1000, 1100, 1200, ...}. The fast algorithm proposed in [3] is summarised in this work as Algorithm 3.…”
Section: Assessing the Time Inconsistency Gapmentioning
confidence: 99%
See 3 more Smart Citations