2021
DOI: 10.1016/j.renene.2021.07.012
|View full text |Cite
|
Sign up to set email alerts
|

Assessing demand compliance and reliability in the Philippine off-grid islands with Model Predictive Control microgrid coordination

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(3 citation statements)
references
References 31 publications
0
3
0
Order By: Relevance
“…As for microgrid systems, geospatial analysis was still used to assess available energy resources in this area, coupled with other methods such as cluster analysis [45] or multicriteria decision making such as Fuzzy AHP-TOPSIS [46]. Different energy models were also proposed, such as Model Predictive Control microgrid coordination [47] which was used to determine off-grid system reliability. Aside from technology-specific models, generation expansion models for grid-level modeling were also proposed by Nobleza et al [48] based on the Long-Range Energy Alternatives Planning System (LEAP) model.…”
Section: Methods For Sizing and Technology Selectionmentioning
confidence: 99%
“…As for microgrid systems, geospatial analysis was still used to assess available energy resources in this area, coupled with other methods such as cluster analysis [45] or multicriteria decision making such as Fuzzy AHP-TOPSIS [46]. Different energy models were also proposed, such as Model Predictive Control microgrid coordination [47] which was used to determine off-grid system reliability. Aside from technology-specific models, generation expansion models for grid-level modeling were also proposed by Nobleza et al [48] based on the Long-Range Energy Alternatives Planning System (LEAP) model.…”
Section: Methods For Sizing and Technology Selectionmentioning
confidence: 99%
“…In (39), two terms are present: the first one is intended to assign a cost to power curtailment, such that the system is operated as close as possible to MPPT when MPPT is not possible. The second term, on the contrary, assign a cost to variations in power curtailment, which is intended to avoid large changes in generated power from one step to the following.…”
Section: Cost Functionmentioning
confidence: 99%
“…This is of foremost importance for stand-alone PV systems, where energy availability is bounded to discontinuous PV generation and power supply availability is granted by ESS with limited capacity. Indeed, some papers propose MPC-based controllers for DC microgrids [35][36][37][38][39][40][41][42], addressing different tasks spanning from Maximum Power Point Tracking (MPPT) and voltage control to economic optimization and hierarchical control. In these regards, it is clear that the MPC control performances are related to forecasts reliability.…”
Section: Introductionmentioning
confidence: 99%