Assembly Building Material Management Method Based on BIM Technology

Abstract: The primary goal of material management is to reasonably arrange the use of materials, which is particularly important for the construction industry. In the process of material management, on the premise of meeting the requirements of production and construction materials, try not to increase additional inventory and reduce the amount of capital. In order to explore the method of prefabricated building material management, this paper uses the method of sampling survey and sand table simulation technology to co… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 18 publications
0
2
0
Order By: Relevance
“…BIM enables better planning and coordination of prefabricated components throughout the whole prefabricated building lifecycle management [35]. During the construction phase, the BIM integrated management process contributes to supply chain efficiency, on-site labour, and waste reduction [36]. Since procurement, logistics, safety, and cost contribute to sustainable decision making, they can be assessed as mediators in the proposed construct.…”
Section: Mediating Effects In the Bim-enabled Materials Management An...mentioning
confidence: 99%
See 1 more Smart Citation
“…BIM enables better planning and coordination of prefabricated components throughout the whole prefabricated building lifecycle management [35]. During the construction phase, the BIM integrated management process contributes to supply chain efficiency, on-site labour, and waste reduction [36]. Since procurement, logistics, safety, and cost contribute to sustainable decision making, they can be assessed as mediators in the proposed construct.…”
Section: Mediating Effects In the Bim-enabled Materials Management An...mentioning
confidence: 99%
“…Poor materials management is one of the critical challenges of building projects [29,34,36]. From the survey results it is observed that, while working in isolation, design engineers tend to underestimate the importance of the supply chain in a range of aspects such as supplier selection, lead times, regulatory requirements, etc.…”
Section: Materials Managementmentioning
confidence: 99%