2008
DOI: 10.13182/fst08-a1904
|View full text |Cite
|
Sign up to set email alerts
|

ARIES-CS Maintenance System Definition and Analysis

Abstract: The goal of the ARIES compact stellarator is to define and assess a stellarator-based fusion power plant to

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2011
2011
2020
2020

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 18 publications
(3 citation statements)
references
References 11 publications
0
3
0
Order By: Relevance
“…A discount rate of 10% is employed, assuming that high risk is expected due to the initial introduction of fusion deployment, and 15% of the hybrid system TCI for salvage rate is applied 94 . The capacity of the biomass plant inherently account for an annual 7446 hours (approximate 85% of a year), which is for equipment refurbishment and replacement for the hybrid system 95,96 . The double balance method and 30% of income tax is assumed.…”
Section: Methodsmentioning
confidence: 99%
“…A discount rate of 10% is employed, assuming that high risk is expected due to the initial introduction of fusion deployment, and 15% of the hybrid system TCI for salvage rate is applied 94 . The capacity of the biomass plant inherently account for an annual 7446 hours (approximate 85% of a year), which is for equipment refurbishment and replacement for the hybrid system 95,96 . The double balance method and 30% of income tax is assumed.…”
Section: Methodsmentioning
confidence: 99%
“…Maintaining and replacing stellarator components can be considerably more challenging compared to tokamaks if the access to internal elements is limited by the lateral space between modular coils [112]. This space determines the maximum dimensions of blanket and divertor modules.…”
Section: Fabrication Integration and Maintenancementioning
confidence: 99%
“…Design studies advancing high availability have been undertaken for a number of years within the fusion community incorporating a range of configuration arrangements with varying maintenance concepts [6][7][8][9][10][11][12][13][14][15][16][17][18]. Reasonable availability was evaluated in an ARIES-CS stellarator study [12][13] which incorporated an ITER style port maintenance scheme, assuming a tenth of a kind plant and optimistic maintenance assumptions.…”
Section: Configuration Concepts and Design Philosophymentioning
confidence: 99%