Are conventional energy megaprojects competitive? Suboptimal decisions related to cost overruns in Brazil

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

4
15
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
5
1

Relationship

4
2

Authors

Journals

citations
Cited by 20 publications
(19 citation statements)
references
References 25 publications
4
15
0
Order By: Relevance
“…), even though there is no climate mitigation target. This can be explained by investment costs for large‐scale oil refineries, which are relatively expensive, as mentioned in Köberle et al . and Silverio .…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…), even though there is no climate mitigation target. This can be explained by investment costs for large‐scale oil refineries, which are relatively expensive, as mentioned in Köberle et al . and Silverio .…”
Section: Resultsmentioning
confidence: 99%
“…The efficiency of the technologies is based on lower heating values obtained from the literature. The location factor used in this study for Brazil is 1.3 . The location factor is a factor that adds the costs of equipment and machinery that needs to be imported for the construction of (energy) projects .…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…We have tried to control this important issue by comparing our data to the data of other models in the major modeling effort of the CD-links project. Nevertheless, we do recognize that in Brazil location cost factors may be important, given the country's labor and capital productivity 92 . Moreover, we also acknowledge that energy megaprojects in Brazil have been facing overrun costs and construction delays 98 .…”
Section: Cost Of Technological Optionsmentioning
confidence: 86%
“…In terms of our own modelling effort, it is worth saying that we recognize the need to implement some probabilistic and risk analyses in our model 92 . However, this is not trivial, given the large level of detail in the technological representation and the high number of key variables within the BLUES model.…”
Section: Limitation Of the Study And Sensitivity Analysesmentioning
confidence: 99%