Applying Metaheuristic Strategies in Construction Projects Management

Abstract: This work deals with the application of artificial intelligence instruments in a building schedule. In this article there was presented an original optimization scatter search algorithm taking into consideration both technological and organizational restrictions. This algorithm was applied to the real analysis of the industrial building project realization.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
18
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 41 publications
(20 citation statements)
references
References 36 publications
0
18
0
Order By: Relevance
“…environmental specialists have considered the sustainability of environmental evaluation from the point of view of environmental impact assessment putting the emphasis on the fact that the living environment is a complex multi-level system, which needs to be assessed as an integrated aggregate in the context of a wide-ranging model (Bożejko et al 2012).…”
Section: Discussionmentioning
confidence: 99%
“…environmental specialists have considered the sustainability of environmental evaluation from the point of view of environmental impact assessment putting the emphasis on the fact that the living environment is a complex multi-level system, which needs to be assessed as an integrated aggregate in the context of a wide-ranging model (Bożejko et al 2012).…”
Section: Discussionmentioning
confidence: 99%
“…Ko, Wang 2010), but rarely in construction projects (e.g. Bożejko et al 2012). One of the most commonly used models in scheduling theory is permutation flow shop system (Gupta, Stafford 2006).…”
Section: Introductionmentioning
confidence: 99%
“…In this case, the contemporary achievements of the job scheduling theory in the field of flow shop problems will be helpful (Gupta & Stafford, 2006), which are NP-hard already for n = 3 objects of the project. These problems are mainly used in electronics, the chemical industry, the automotive industry, and less frequently in construction (Bożejko, Hejducki, & Wodecki, 2012;Bożejko, Hejducki, Uchroński, & Wodecki, 2014;Podolski, 2016Podolski, , 2017. The article (Bożejko et al, 2012) presents the problem of a multiunit construction projects, in which a solution was sought to minimize costs, including only penalties for exceeding the imposed deadlines for the construction of units.…”
Section: Introductionmentioning
confidence: 99%
“…These problems are mainly used in electronics, the chemical industry, the automotive industry, and less frequently in construction (Bożejko, Hejducki, & Wodecki, 2012;Bożejko, Hejducki, Uchroński, & Wodecki, 2014;Podolski, 2016Podolski, , 2017. The article (Bożejko et al, 2012) presents the problem of a multiunit construction projects, in which a solution was sought to minimize costs, including only penalties for exceeding the imposed deadlines for the construction of units. The solution, which was the order of units' realization, was obtained using the scatter search algorithm.…”
Section: Introductionmentioning
confidence: 99%