2018
DOI: 10.1109/tdei.2018.006996
|View full text |Cite
|
Sign up to set email alerts
|

Application of UHF method for partial discharge source location in power transformers

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
30
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 61 publications
(30 citation statements)
references
References 37 publications
0
30
0
Order By: Relevance
“…As an effective PD source solution method, the time difference of arrival (TDOA) method has the advantages of simple principle and universal application . The TDOA method requires at least four sensors S i ( i = 1, 2, 3, 4), as shown in Fig.…”
Section: Error Analysis Of Pd Source Z‐coordinate With Plane Layout Umentioning
confidence: 99%
“…As an effective PD source solution method, the time difference of arrival (TDOA) method has the advantages of simple principle and universal application . The TDOA method requires at least four sensors S i ( i = 1, 2, 3, 4), as shown in Fig.…”
Section: Error Analysis Of Pd Source Z‐coordinate With Plane Layout Umentioning
confidence: 99%
“…Ultra-high frequency (UHF) partial discharge measurement in power transformers is performed by using UHF sensors to measure electromagnetic (EM) waves that are generated during the partial discharge (PD) event and then propagate inside the tank until reaching the sensors. The method enjoys certain advantages over traditional electrical PD measurement, such as the possibility of three-dimensional source localization and continuous online monitoring [ 1 , 2 ]. However, improving localization accuracy requires understanding the propagation paths inside transformers, which are quite complex.…”
Section: Introductionmentioning
confidence: 99%
“…PD measurement methods based on electrical, acoustic, chemical, and mechanical phenomena associated with the PD process have been used for many years as nondestructive offline or online techniques for insulation condition evaluation of high-voltage equipment [ 4 , 5 , 6 ]. These methods include the pulse current method (IEC 60270) [ 7 ], HF (3–30 MHz) [ 8 ], VHF (30–300 MHz) [ 9 ], UHF (300 MHz–3 GHz) method [ 10 , 11 , 12 ], the transient earth voltage (TEV) method [ 13 , 14 , 15 ], the acoustic emission method [ 16 , 17 , 18 ], and the oscillating wave test method [ 19 ]. The biggest challenges for continuous PD measurement of cable termination are low-cost and high-sensitivity sensors.…”
Section: Introductionmentioning
confidence: 99%