“…• From time or calculation saving view point, it is less efficient to determine an AC equivalent network and hence most of the proposed methods are based on DC load-flow equations [11,21,38]. • It is an advantage in developing a probabilistic equivalent model, to observe the following points [3][4][5][6][9][10][11][12][13]18,22,24,37,39,62]: -Keeping the identity or effects of important or determinant elements. -Possibility of including generation and load changes without wide variation in the model parameters.…”