2020
DOI: 10.1299/jsmemecj.2020.j01224
|View full text |Cite
|
Sign up to set email alerts
|

Application of Operational TPA by Employing Several Measurement Systems and Accuracy Verification

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…However, if the target product or structure is very large (e.g., over 100 m), using very long external cable for the connection is time and cost consuming and this may deteriorate the accuracy of OTPA. In a previous study, OTPA accuracy using several measurement systems linked by optical cable or GPS were actually investigated (Nozuchi, 2020). The result indicates that GPS link was not enough to obtain accurate contribution.…”
Section: Introductionmentioning
confidence: 99%
“…However, if the target product or structure is very large (e.g., over 100 m), using very long external cable for the connection is time and cost consuming and this may deteriorate the accuracy of OTPA. In a previous study, OTPA accuracy using several measurement systems linked by optical cable or GPS were actually investigated (Nozuchi, 2020). The result indicates that GPS link was not enough to obtain accurate contribution.…”
Section: Introductionmentioning
confidence: 99%