2013
DOI: 10.4028/www.scientific.net/amm.405-408.3103
|View full text |Cite
|
Sign up to set email alerts
|

Application of Modularized Low-Position Jacking Formwork System in Core-Tube Building

Abstract: Compared with other template construction technology, jacking formwork system has the advantages of self-climbing, less operating personnel, good safety and good construction quality, with relatively innovative construction techniques and technology and has been widely used in the construction of tall buildings in recent years. The lifting principles and characteristics of jacking formwork were introduced in the paper. Based on the application in a tall building project, construction technologies of the formwo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
1
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
1
0
Order By: Relevance
“…Taking a super high-rise project in the Yanta District of Xi'an as the subject, this paper uses Midas Gen 2022 to establish a finite element model to simulate and analyze the member stress and the inclination angle of the main column of the jack-up steel platform. The field monitoring data are compared with the simulated values to obtain the degree of agreement between the two stress values, and then the safety evaluation of the project is carried out [15][16][17].…”
Section: Introductionmentioning
confidence: 99%
“…Taking a super high-rise project in the Yanta District of Xi'an as the subject, this paper uses Midas Gen 2022 to establish a finite element model to simulate and analyze the member stress and the inclination angle of the main column of the jack-up steel platform. The field monitoring data are compared with the simulated values to obtain the degree of agreement between the two stress values, and then the safety evaluation of the project is carried out [15][16][17].…”
Section: Introductionmentioning
confidence: 99%
“…The analysis of publications [17][18][19][20][21] shows that the development and improvement methods are mainly focused on forming systems used for building new properties, where a form, being a permanent structure, often becomes a part of the structural elements to be erected. This approach allows reducing labor input in construction, improve the quality of construction works and cut down construction costs.…”
Section: Introductionmentioning
confidence: 99%