2021
DOI: 10.1007/978-981-16-3138-2_1
|View full text |Cite
|
Sign up to set email alerts
|

Application of Human-Machine Collaboration Algorithm for Mine Pile Weight Estimation Based on Beidou High-Precision Location Service

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…The conventional drilling position of cast-in-place piles is determined by manual positioning or machine-assisted positioning, which makes the drilling rig easily deviate from the designed pile position due to lack of real-time monitoring data. Based on BDS (Beidou navigation and positioning System), some foundation projects monitored the whole process of pile foundation hole-formation positioning and laying [15][16][17] , and adopted Real-time kinematic (carrier phase differential positioning) technology in BDS to position the horizontal and elevation position of the target object, and converted the position of pile point from the coordinate position. To realize the automatic navigation and positioning of pile location, the positioning accuracy can meet the engineering requirements.…”
Section: Combining Positioning Technologiesmentioning
confidence: 99%
“…The conventional drilling position of cast-in-place piles is determined by manual positioning or machine-assisted positioning, which makes the drilling rig easily deviate from the designed pile position due to lack of real-time monitoring data. Based on BDS (Beidou navigation and positioning System), some foundation projects monitored the whole process of pile foundation hole-formation positioning and laying [15][16][17] , and adopted Real-time kinematic (carrier phase differential positioning) technology in BDS to position the horizontal and elevation position of the target object, and converted the position of pile point from the coordinate position. To realize the automatic navigation and positioning of pile location, the positioning accuracy can meet the engineering requirements.…”
Section: Combining Positioning Technologiesmentioning
confidence: 99%
“…The conventional drilling position of cast-in-place piles is determined by manual positioning or machine-assisted positioning, which makes the drilling rig easily deviate from the designed pile position due to lack of real-time monitoring data. Based on BDS (Beidou navigation and positioning System), some foundation projects monitored the whole process of pile foundation hole-formation positioning and laying 15 – 17 , and adopted Real-time kinematic (carrier phase differential positioning) technology in BDS to position the horizontal and elevation position of the target object, and converted the position of pile point from the coordinate position. To realize the automatic navigation and positioning of pile location, the positioning accuracy can meet the engineering requirements.…”
Section: Intelligent Monitoring Of Bored Pile Constructionmentioning
confidence: 99%