ASME 2020 Power Conference 2020
DOI: 10.1115/power2020-16885
|View full text |Cite
|
Sign up to set email alerts
|

Application of GE Low Load Package on an Existing District Heating Power Plant: A Case Study

Abstract: The continuous increase of variable renewable energy and fuel cost requires steam turbine power plants to operate with high flexibility. Furthermore, the reduction in electricity price is forcing many existing and new district heating power plants to further optimize the heat production to maintain a sustainable business. This situation leads to low pressure steam turbines running at very low volume flow for an extended time. In this work, a case study of an existing 30 MWel district heating pow… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance