2019 International Russian Automation Conference (RusAutoCon) 2019
DOI: 10.1109/rusautocon.2019.8867641
|View full text |Cite
|
Sign up to set email alerts
|

Application of Fuzzy Logic Algorithms in Load Control System of Electric Drive of Coal Combine

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 6 publications
0
2
0
Order By: Relevance
“…Modern research shows that the load on the cutting tool can be adjusted by changing the speed of movement of the shearer itself by using a variablefrequency electric drive in the shearer feeding system [3]. To accomplish this, a cutting current (load) controller (CCC) is installed in the shearer control system-CCC in the form of a PI controller designed to prevent the overloading or overturning of the cutting drive motor by controlling the operating current parameter of the cutting motor I c with a signal from the current sensor by changing the feed speed V f of the shearer when the coal cutting resistance A and the operating conditions of the shearer change.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Modern research shows that the load on the cutting tool can be adjusted by changing the speed of movement of the shearer itself by using a variablefrequency electric drive in the shearer feeding system [3]. To accomplish this, a cutting current (load) controller (CCC) is installed in the shearer control system-CCC in the form of a PI controller designed to prevent the overloading or overturning of the cutting drive motor by controlling the operating current parameter of the cutting motor I c with a signal from the current sensor by changing the feed speed V f of the shearer when the coal cutting resistance A and the operating conditions of the shearer change.…”
Section: Introductionmentioning
confidence: 99%
“…For instance, according to [1], in the period between 2005 and 2018, the Vietnamese mining industry replenished the amount of the state treasury by 9.39% of GDP. To achieve gains, the mineral production needs advanced technologies, including high-performance machines and equipment [2][3][4][5][6][7][8], environmental mitigation [9][10][11][12], as well as process automation and digitalization [13,14]. One of the fields that demands much mineral resources is construction, and the main construction material is crushed granite.…”
Section: Introductionmentioning
confidence: 99%