2021
DOI: 10.1016/j.ress.2020.107246
|View full text |Cite
|
Sign up to set email alerts
|

Application of Expanded Event Trees combined with uncertainty analysis methodologies

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 13 publications
(2 citation statements)
references
References 23 publications
0
2
0
Order By: Relevance
“…In the view of redundant system modeling, Probabilistic Graphical Model (PGA) is the primary method to predict system reliability, and it could be built by empirical analysis and structural learning. In terms of empirical research, the reliability of the system is deduced from models with independent assumptions and logical structures such as FTA, 19,20 Event Tree Analysis (ETA), 21,22 and Bow-tie 23,24 model. However, FTA, ETA, and Bow-tie models assume units are independent at different times, and they can't structure the time-lag correlation between units or repeat deducing system reliability when states of unit change.…”
Section: Introductionmentioning
confidence: 99%
“…In the view of redundant system modeling, Probabilistic Graphical Model (PGA) is the primary method to predict system reliability, and it could be built by empirical analysis and structural learning. In terms of empirical research, the reliability of the system is deduced from models with independent assumptions and logical structures such as FTA, 19,20 Event Tree Analysis (ETA), 21,22 and Bow-tie 23,24 model. However, FTA, ETA, and Bow-tie models assume units are independent at different times, and they can't structure the time-lag correlation between units or repeat deducing system reliability when states of unit change.…”
Section: Introductionmentioning
confidence: 99%
“…There are sev eral rea sons for this. The two main ones are that the re serves of qual ity fos sil fu els are de creasing and that the use of fos sil fu els sig nif i cantly con tributes to the con tam i na tion of the en vi ron ment [1,2]. The so-called green (al ter na tive) en ergy sources are prob lem atic be cause they pro duce elec tric ity at a much higher price, and they are not com pletely without im pact on the en vi ron ment.…”
Section: Introductionmentioning
confidence: 99%