2013
DOI: 10.1109/tie.2012.2206348
|View full text |Cite
|
Sign up to set email alerts
|

Application of Ethernet Powerlink for Communication in a Linux RTAI Open CNC system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
29
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 61 publications
(29 citation statements)
references
References 19 publications
0
29
0
Order By: Relevance
“…I/O mapping table will be the task of the process variables and the I/O module input and output mapping directly, in addition to direct the configuration of the special attributes of the I/O module. Automation Runtime memory area is divided into two parts, ram and ROM, ROM in the CF card and is divided into UserROM and SystemROM, project of atherosclerosis and related configuration file is stored in the UserROM, SystemROM is stored automation runtime and called the project file system [4].…”
Section: Powerlink Industrial Ethernetmentioning
confidence: 99%
“…I/O mapping table will be the task of the process variables and the I/O module input and output mapping directly, in addition to direct the configuration of the special attributes of the I/O module. Automation Runtime memory area is divided into two parts, ram and ROM, ROM in the CF card and is divided into UserROM and SystemROM, project of atherosclerosis and related configuration file is stored in the UserROM, SystemROM is stored automation runtime and called the project file system [4].…”
Section: Powerlink Industrial Ethernetmentioning
confidence: 99%
“…For the time complexity, the most time consuming part is the fitness function calculation process in the main loop of the algorithm because this process contains the matrix operation and the non-dominated sorting. To calculate the optimization objectives, the time complexity is 1 = ( ( + ) 4 ), in which is the offspring quantity of the mating pool, and are the quantities of branch nodes and leaf nodes respectively. The complexity of the non-dominated sorting is ( ( + ) 2 ), and the complexity of the crowding distance assignment is ( ( + ) ( + )), so the whole time complexity of sorting part is 2 = ( ( + ) 2 ) , in which is the optimization objective quantity and is the population quantity.…”
Section: F Complexity Analysismentioning
confidence: 99%
“…The complexity of the non-dominated sorting is ( ( + ) 2 ), and the complexity of the crowding distance assignment is ( ( + ) ( + )), so the whole time complexity of sorting part is 2 = ( ( + ) 2 ) , in which is the optimization objective quantity and is the population quantity. In the worst-case scenario, 1 consumes more computation time than 2 , so the whole time complexity of proposed algorithm is ( ( + ) 4 ). For the space complexity, ( ( + ) 3 ) computation storage is required for the matrix operation and the sorting storage requirement is ( 2 ( + ) 2 ).…”
Section: F Complexity Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…POWERLINK [16] Figure 4. The Ethernet-based technology POWERLINK fulfills all requirements and is selected for the further implementation of the rel-time realted part of the CAP/CAB concept.…”
Section: Investigating and Evaluation Of Real-time Communication mentioning
confidence: 99%