Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
31
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 51 publications
(36 citation statements)
references
References 37 publications
1
31
0
Order By: Relevance
“…Koo et al (2010) developed a case-based reasoning hybrid model for predicting construction cost and duration and based on project characteristics in multihousing projects. Jin et al (2016) developed a case-based reasoning model for multi-housing projects estimating the construction duration in the project planning phase and validated its applicability and effectiveness through application of 83 multi-housing projects. Czarnigowska and Sobotka (2014) presented a model of the road construction duration based on relationships between the project qualities.…”
Section: Scope and Methods Of The Studymentioning
confidence: 99%
See 3 more Smart Citations
“…Koo et al (2010) developed a case-based reasoning hybrid model for predicting construction cost and duration and based on project characteristics in multihousing projects. Jin et al (2016) developed a case-based reasoning model for multi-housing projects estimating the construction duration in the project planning phase and validated its applicability and effectiveness through application of 83 multi-housing projects. Czarnigowska and Sobotka (2014) presented a model of the road construction duration based on relationships between the project qualities.…”
Section: Scope and Methods Of The Studymentioning
confidence: 99%
“…Third, based on the case studies applied to local office buildings, the accuracy and validity of the developed model was verified by comparison analysis between the actual construction duration and the predicted construction duration calculated from an approximate construction duration prediction model. Generally, the construction duration for office buildings are determined in two ways: the owner defines the project duration directly (Jin et al 2016;Bayram 2017;Pe拧ko et al 2017) or the contractor suggests construction duration to the owner. On the other hand, the construction duration computation model utilized by contractors during the project planning stage (Table 1) is not a specialized standard for general office buildings Koo et al 2010;Jin et al 2016;Kim et al 2016;Thomas, N., Thomas, A. V. 2016).…”
Section: Scope and Methods Of The Studymentioning
confidence: 99%
See 2 more Smart Citations
“…Jin et al (2015) developed a CBR model aimed at multi-housing projects capable of accurately estimating the construction duration in the preliminary stage. Nguyen et al (2013) identified the C.P.…”
Section: Previous Studies On Estimation Of Construction Durationmentioning
confidence: 99%