Application development for accidental pollution assessment on chemical manufacturers (pollution from chemical waste)

Abstract: Considering that in recent decades there has been a dramatic increase in the amount of industrial disasters, among which accidents on chemical facilities retain a significant place, forecasting tasks and accident consequence assessment on hazardous chemical facilities are analyzed in this paper. The task of the emergency area size determination, as well as the determination of building destruction level, and the facility personnel and public expenses. The objective of the paper is to review the existing method… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
12
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 20 publications
(12 citation statements)
references
References 6 publications
0
12
0
Order By: Relevance
“…In addition, banks must comply with the following standards: maximum exposure to one borrower and a group of related borrowers; the maximum size of large credit risks; the maximum amount of loans, bank guarantees and sureties provided by the bank to its participants; the aggregate amount of risk for the bank's insiders; the standard for using the bank's own funds to acquire shares of other legal entities. [17][18][19][20][21][22] At the same time, urban planning standards provide for the presence in rural settlements of 1 operational place for 1-2 thousand people [23][24][25][26][27][28][29]. As can be seen from the data for the Kinelsky district of the Samara region, this standard is not observed anywhere, which complicates the availability of banking services for the population.…”
Section: Resultsmentioning
confidence: 99%
“…In addition, banks must comply with the following standards: maximum exposure to one borrower and a group of related borrowers; the maximum size of large credit risks; the maximum amount of loans, bank guarantees and sureties provided by the bank to its participants; the aggregate amount of risk for the bank's insiders; the standard for using the bank's own funds to acquire shares of other legal entities. [17][18][19][20][21][22] At the same time, urban planning standards provide for the presence in rural settlements of 1 operational place for 1-2 thousand people [23][24][25][26][27][28][29]. As can be seen from the data for the Kinelsky district of the Samara region, this standard is not observed anywhere, which complicates the availability of banking services for the population.…”
Section: Resultsmentioning
confidence: 99%
“…This paragraph defines the enterprise structure and the main parameters of its subdivisions (arable land and agricultural land, livestock and its structure, etc.). The information obtained and analyzed in this way will make it possible to take into account the unique nature and characteristics of each enterprise in the calculation [28][29][30][31]. The next step is to build a simulation model.…”
Section: Resultsmentioning
confidence: 99%
“…The calculations of costs of Acantholyda posticalis eradication and suppression activities in the Stavropol forest stands, presented in table 1, show that the highest costs were for the rent of units -357.4 thousand RUB (49%) and purchase and delivery of the E3S Web of Conferences 203, 03005 (2020) EBWFF-2020 https://doi.org/10.1051/e3sconf/202020303005 product -339.29 thousand RUB (47%). Other costs, such as the price of the insecticide diluent, spring control examinations of pests harborage areas, estimation of efficiency and activities on the restriction of individuals' presence in forests, were no more than 4% [24]. The cost of 1 kg of the insecticide was described as the lowest based on three price lists.…”
Section: Resultsmentioning
confidence: 99%