2022
DOI: 10.3390/su142416908
|View full text |Cite
|
Sign up to set email alerts
|

Application and Optimization of the Parameters of the High-Level Boreholes in Lateral High Drainage Roadway

Abstract: The key parameters of high-level boreholes in high drainage roadways affect the gas treatment effect of the working face directly. Therefore, the layout parameters of high-level boreholes in the lateral high drainage roadway (LHDR) are determined and optimized as necessary. Based on the LHDR layout on the 2-603 working face of the Liyazhuang coal mine, the key technological requirements on high-level borehole parameters were analyzed and the distribution characteristics of the gas volume fraction in the coal r… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 33 publications
0
2
0
Order By: Relevance
“…Former research has shown that a rock drainage roadway and high-level directional extraction borehole can effectively extract gas in the fissure zone and have great operational stability in the upper corner of the goaf and return air flow [10][11][12][13]. However, the rock drainage roadway has the disadvantage of requiring a large amount of site construction, long operation cycles, and high costs [14][15][16]. With improved equipment, the high-level directional extraction borehole can replace the high-level drainage roadway to extract gas in the goaf and fissure cycles, and high costs [14][15][16].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Former research has shown that a rock drainage roadway and high-level directional extraction borehole can effectively extract gas in the fissure zone and have great operational stability in the upper corner of the goaf and return air flow [10][11][12][13]. However, the rock drainage roadway has the disadvantage of requiring a large amount of site construction, long operation cycles, and high costs [14][15][16]. With improved equipment, the high-level directional extraction borehole can replace the high-level drainage roadway to extract gas in the goaf and fissure cycles, and high costs [14][15][16].…”
Section: Introductionmentioning
confidence: 99%
“…However, the rock drainage roadway has the disadvantage of requiring a large amount of site construction, long operation cycles, and high costs [14][15][16]. With improved equipment, the high-level directional extraction borehole can replace the high-level drainage roadway to extract gas in the goaf and fissure cycles, and high costs [14][15][16]. With improved equipment, the high-level directional extraction borehole can replace the high-level drainage roadway to extract gas in the goaf and fissure zone, which can shorten the construction period, save construction costs, and improve the efficiency of gas control [17][18][19].…”
Section: Introductionmentioning
confidence: 99%