2013
DOI: 10.4028/www.scientific.net/amm.448-453.2839
|View full text |Cite
|
Sign up to set email alerts
|

Application Analysis of Pile Foundation Ground Source Heat Pump System

Abstract: Pile foundation thermal response test method was adopted to measure the heat transfer capacity of the pile foundation U-pipe heat exchanger. The heat pump system of pile foundation buried pipe was designed. BIN method was adopted to calculate the annual dynamic load of office in Shanghai and annual energy consumption, and its energy-saving effect was determined by comparing with the air-cooled heat pump air conditioning system. Finally, annual cost method was employed to study the investment and annual operati… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2016
2016
2016
2016

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 4 publications
(3 reference statements)
0
0
0
Order By: Relevance