2018
DOI: 10.1088/1755-1315/128/1/012028
|View full text |Cite
|
Sign up to set email alerts
|

Application Analysis of BIM Technology in Metro Rail Transit

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…On this ground, we propose in this study to build a BIM integrated analysis and decision-making process that focuses on the interactions between individual material elements and structures to generate low energy consumption, low carbon emissions, and sustainable buildings. In 2018, Liu and Sun demonstrated the innovative study on the life cycle based on BIM in the rail transit of Shenzhen metro line 9 [15]. However, the analysis was focused only on the cost.…”
Section: Bim Technique and Life Cyclementioning
confidence: 99%
“…On this ground, we propose in this study to build a BIM integrated analysis and decision-making process that focuses on the interactions between individual material elements and structures to generate low energy consumption, low carbon emissions, and sustainable buildings. In 2018, Liu and Sun demonstrated the innovative study on the life cycle based on BIM in the rail transit of Shenzhen metro line 9 [15]. However, the analysis was focused only on the cost.…”
Section: Bim Technique and Life Cyclementioning
confidence: 99%
“…Adhering to the principle of avoiding art-flow pipeline and small pipe to large pipe, the pipeline design gradually becomes more reliable and the pipeline detection has an optimization basis. Collision points are marked with collision element ID to improve the normalization of collision detection, facilitate the description of collision points, and ensure the smooth progress of collision detection [2].…”
Section: Collision Detectionmentioning
confidence: 99%
“…The alleviation of urban traffic congestion is an efficient way with the development of urban roads. The site space, complex resource allocation and tight schedule are limited [12]. These technical problems are solved by the BIM technology, three-dimensional visualization and parameterization.…”
Section: Fig 11 Integration Of Bim and Gismentioning
confidence: 99%