2018
DOI: 10.1504/ijcse.2018.095849
|View full text |Cite
|
Sign up to set email alerts
|

Applicability of the software cost model COCOMO II to HPC projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
4
0
1

Year Published

2019
2019
2022
2022

Publication Types

Select...
3
3

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 0 publications
0
4
0
1
Order By: Relevance
“…Closely related to the Function Point method, the algorithmic cost model Constructive Cost Model (COCOMO) is also used in software development for cost or effort estimation. Miller et al (2018) demonstrate the applicability of the COCOMO in practice. Singh et al (2018) estimate the effort and costs of software development from the manufacturer's perspective based on a parametric algorithm using historical information from past projects.…”
Section: Review Resultsmentioning
confidence: 83%
See 1 more Smart Citation
“…Closely related to the Function Point method, the algorithmic cost model Constructive Cost Model (COCOMO) is also used in software development for cost or effort estimation. Miller et al (2018) demonstrate the applicability of the COCOMO in practice. Singh et al (2018) estimate the effort and costs of software development from the manufacturer's perspective based on a parametric algorithm using historical information from past projects.…”
Section: Review Resultsmentioning
confidence: 83%
“…Closely related to the Function Point method, the algorithmic cost model Constructive Cost Model (COCOMO) is also used in software development for cost or effort estimation. Miller et al (2018) demonstrate the applicability of the COCOMO in practice.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The collected productivity data of the students opens up wide areas of research into HPC programming productivity such as the estimation of software costs of HPC projects. While most of this research is ongoing and will require more data, some early results can be found in [2,3,6]. Figure 2 provides an example for the analyses carried out on the productivity data collected during the OpenMP lab in summer 2019.…”
Section: Evaluation Of the Labsmentioning
confidence: 99%
“…Além disso, encontrar uma amostra representativa de participantes experientes no domínio da programac ¸ão paralela é desafiador. Logo, o uso de métricas de codificac ¸ão bem estabelecidas na área de Engenharia de Software (e.g., Linhas de Código (LOC), Halstead e Constructive Cost Model -COCOMO) pode facilitar a avaliac ¸ão da produtividade [Adornes et al 2015, Griebler et al 2018, Miller et al 2018, Rodriguez-Canal et al 2021, Martínez et al 2022, Peccerillo e Bartolini 2022. Porém, nosso estudo anterior [Andrade et al 2021] mostrou limitac ¸ões, uma vez que estas métricas de codificac ¸ão não foram projetados para avaliar aplicac ¸ões paralelas.…”
Section: Introduc ¸ãOunclassified