2009
DOI: 10.1063/1.3292301
|View full text |Cite
|
Sign up to set email alerts
|

Antenna coupled Kinetic Inductance arrays for space and ground based imaging arrays

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2009
2009
2024
2024

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 9 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…The reduction of the Q-factor at a higher blackbody temperature is due to increasing R a and R m . The operation is somewhat similar to a traditional antenna-coupled MKID device [18]. The effective area of L a and R a in the resonator is difficult to calculate directly but mainly confined to the area between the choke filters at two sides.…”
Section: Thz Direct Detectionmentioning
confidence: 94%
“…The reduction of the Q-factor at a higher blackbody temperature is due to increasing R a and R m . The operation is somewhat similar to a traditional antenna-coupled MKID device [18]. The effective area of L a and R a in the resonator is difficult to calculate directly but mainly confined to the area between the choke filters at two sides.…”
Section: Thz Direct Detectionmentioning
confidence: 94%
“…Today, MKID arrays are produced in many laboratories (see e.g. [150][151][152] ) and are starting to be operated at large telescopes (see e.g. 153,154 ).…”
Section: Mapping Speedmentioning
confidence: 99%
“…Even if the KID concept had been proposed more than five years earlier 14 , at that time multiplexed KID hadn't been demostrated yet at a telescope, and the achieved sensitivities on the sky were still rather poor. Despite that, new ideas like the Lumped Element KID (LEKID) proposed by Doyle et al 10 and the encouraging preliminary results concerning antenna-coupled KID 11 convinced us that building such an instrument was possible in a relatively short amount of time. Three European laboratories (Institut Neel, AIG Cardiff, SRON) decided on this base to start an intense phase of development culminated in October 2009, i.e.…”
Section: The Nika Development: 2009-2013mentioning
confidence: 99%