2010
DOI: 10.1016/j.sbspro.2010.04.022
|View full text |Cite
|
Sign up to set email alerts
|

Ant colony system based routing and scheduling for hazardous material transportation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
24
0

Year Published

2011
2011
2021
2021

Publication Types

Select...
4
4
2

Relationship

0
10

Authors

Journals

citations
Cited by 65 publications
(25 citation statements)
references
References 12 publications
1
24
0
Order By: Relevance
“…The relationship between the transportation cost/risk and the loading weight of hazardous wastes can also be modelled as a quadratic or nonlinear function. Many previous studies assume the transportation cost/risk from one node to other is a fixed value, regardless of the variation of vehicle loading weight [16,17].…”
Section: Problem Description and Formulationmentioning
confidence: 99%
“…The relationship between the transportation cost/risk and the loading weight of hazardous wastes can also be modelled as a quadratic or nonlinear function. Many previous studies assume the transportation cost/risk from one node to other is a fixed value, regardless of the variation of vehicle loading weight [16,17].…”
Section: Problem Description and Formulationmentioning
confidence: 99%
“…Similarly, in relevant multi-objective time-independent vehicle routing problems, any non-dominated solution comprise non-dominated paths between consecutive stops. Hence, the intermediate multi-objective shortest path problems between stops can be solved in advance, at a preprocessing stage (Pradhananga et al, 2010). However, we show below that in the proposed BTL-VRPTW, the scheduled road paths between consecutive stops included in a non-dominated solution cannot be determined in advance.…”
Section: Network Reductionmentioning
confidence: 99%
“…In addition, the nature of hazardous materials [4,19] together with public security [17] have also been studied as important attributes in this area. Management issues such as road network and vehicle capacity planning [10,20], Hazmat delivery time [1,7], and eventually emergency response have been considered in the above problem [5,12,14,19].…”
Section: Introductionmentioning
confidence: 99%