2011 International Conference on Electric Technology and Civil Engineering (ICETCE) 2011
DOI: 10.1109/icetce.2011.5774225
|View full text |Cite
|
Sign up to set email alerts
|

Analysis on interacting of close-vertical underpass existing subway during construction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
0
0
Order By: Relevance
“…[3] Adopting to build large-scale mathematical and physical artificial models, by the analysis of the new building and existing tunnel deformation and stress alteration we got the Mechanical Characteristic of the new and existing subway tunnel. [4] A network construction model of underground transportation hub safety monitoring center according to the disadvantages of present management mode in underground transportation hub. [5] The Status of Subway Construction Safety Risk Management Analysis Subway station construction method often used open-cut excavation construction method.…”
Section: Introductionmentioning
confidence: 99%
“…[3] Adopting to build large-scale mathematical and physical artificial models, by the analysis of the new building and existing tunnel deformation and stress alteration we got the Mechanical Characteristic of the new and existing subway tunnel. [4] A network construction model of underground transportation hub safety monitoring center according to the disadvantages of present management mode in underground transportation hub. [5] The Status of Subway Construction Safety Risk Management Analysis Subway station construction method often used open-cut excavation construction method.…”
Section: Introductionmentioning
confidence: 99%