2021
DOI: 10.1016/j.nucengdes.2021.111156
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of the natural circulation flow map uncertainties in an integral small modular reactor

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 15 publications
(3 citation statements)
references
References 40 publications
0
3
0
Order By: Relevance
“…Several existing works using RELAP5 (Skolik et al, 2018a;Hosseini et al, 2021) have achieved good agreement with reference values at 100% power. However, data for lower powers at 75%, 50% and 15% are also available in the safety analysis report (NuScale Power LLC 2020c).…”
Section: Steady State Simulationmentioning
confidence: 69%
“…Several existing works using RELAP5 (Skolik et al, 2018a;Hosseini et al, 2021) have achieved good agreement with reference values at 100% power. However, data for lower powers at 75%, 50% and 15% are also available in the safety analysis report (NuScale Power LLC 2020c).…”
Section: Steady State Simulationmentioning
confidence: 69%
“…This standardization also serves to readily facilitate learning from first-of-a-kind (FOAK) to Nth-of-a-kind (NOAK) plants, decrease on-site construction times, and in doing so mitigate the economic risk associated with delayed construction schedules. Integral components, such as steam generators and pressurizers integrated directly within pressure vessels, and passive safety systems eliminate the need for piping, pumps, and other superfluous equipment [17,18]. Carelli et al, provide an overview of the economic advantages of SMRs, in which they argue that the cost increases from economies of scale can be counterbalanced [19,20] As mentioned, the current regulations have been mainly established based on light water reactors; thus, the licensing process should be adopted for the advanced style of SMRs.…”
Section: Pre-licensingmentioning
confidence: 99%
“…Considering Table 3 and all successive applications of the BEPU approach for licensing purposes, it is proposed to extend the implementation area of BEPU covering possibly all the FSAR, where the analytical techniques are required [40]. In some new research papers it is afforded to utilize the best-estimate approach or quantifying uncertainties during case studies that are topics related to SMR technology as minor implications of BEPU [17,[41][42][43].…”
Section: Bepu Application Experiencesmentioning
confidence: 99%