2023
DOI: 10.2478/mspe-2023-0034
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of the Impact of Effective Time Management on Workstation Efficiency Using a Multi-Criteria Optimization Approach

Abstract: The aim of the article is to analyze the impact of effective time management on the performance of workstations in the context of the conflict between maximizing workstation utilization and minimizing the number of items waiting in the queue. The article utilized the FlexSim program to build a simulation model of the workstation and conducted optimization using the built-in optimizer. The research demonstrated that effective time management has a positive impact on workstation performance by reducing the numbe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 25 publications
0
0
0
Order By: Relevance
“…ECRS is one technique to increase forklift efficiency utilization in the case study. The framework consists of eliminating all possible unnecessary work without decreasing value, combining term work movements or changing direction of operations to save time, rearranging sequences or balancing activities of operations and simplifying to improve the work or developing equipment for the necessary operations [13][14][15][16]24) . Kanoksirirujisaya 13) applied the ECRS technique to reduce waste in the QC inspection line of the frozen crab stick process.…”
Section: Introductionmentioning
confidence: 99%
“…ECRS is one technique to increase forklift efficiency utilization in the case study. The framework consists of eliminating all possible unnecessary work without decreasing value, combining term work movements or changing direction of operations to save time, rearranging sequences or balancing activities of operations and simplifying to improve the work or developing equipment for the necessary operations [13][14][15][16]24) . Kanoksirirujisaya 13) applied the ECRS technique to reduce waste in the QC inspection line of the frozen crab stick process.…”
Section: Introductionmentioning
confidence: 99%