2023
DOI: 10.3390/su151914315
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of Surface Settlement Induced by Shield Tunnelling: Grey Relational Analysis and Numerical Simulation Study on Critical Construction Parameters

Minhe Luo,
Ding Wang,
Xuchun Wang
et al.

Abstract: Excessive surface settlement poses significant challenges to shield tunnelling construction, resulting in damage to adjacent buildings, infrastructure, and underground pipelines. This study focused on investigating the surface settlement induced by shield tunnelling during the construction of Qingdao Metro Line 6 between Haigang Road Station and Chaoyang Road Station. Firstly, the settlement data from the left line of the shield tunnel were evaluated by grey relational analysis. The relational coefficients wer… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 37 publications
0
1
0
Order By: Relevance
“…In terms of convergence speed in simulation calculations, multi-modal motion prediction models for vehicles, and solving numerical models with disturbance suppression, ML and AI have significant advantages [40][41][42]. The numerical simulations or AI methods will also have more applications in the field of geotechnical engineering, such as construction process monitoring, multi-physical field coupling, and reliability analysis, which can effectively promote the development of geotechnical engineering [43][44][45]. For example, Shen et al [46] proposed a new time series clustering algorithm for long-term settlement analysis of shield tunnels, which alleviates the limitations of low efficiency in long-term settlement analysis.…”
Section: Introductionmentioning
confidence: 99%
“…In terms of convergence speed in simulation calculations, multi-modal motion prediction models for vehicles, and solving numerical models with disturbance suppression, ML and AI have significant advantages [40][41][42]. The numerical simulations or AI methods will also have more applications in the field of geotechnical engineering, such as construction process monitoring, multi-physical field coupling, and reliability analysis, which can effectively promote the development of geotechnical engineering [43][44][45]. For example, Shen et al [46] proposed a new time series clustering algorithm for long-term settlement analysis of shield tunnels, which alleviates the limitations of low efficiency in long-term settlement analysis.…”
Section: Introductionmentioning
confidence: 99%