2017
DOI: 10.1016/j.jclepro.2017.03.094
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of stakeholder relationships in the industry chain of industrialized building in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
48
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 99 publications
(60 citation statements)
references
References 47 publications
0
48
0
Order By: Relevance
“…The industry has not integrated the process of design, production, transportation, assembly and maintenance into an information platform, which may cause mismatched structural design, lack of qualified labor, low-quality production of prefabricated components, and higher transportation cost. Industry standard [45], [40], [33] X 12 Regulatory mechanism [8], [7], [42] X 13 TF BIM technology [17], [29], [32] X 21 Standardization [40], [33], [43] X 22 Technical talent [17], [7], [12], [ Management mode. PC promotion requires multi-participation management and deep cooperation among partners.…”
Section: Can You Talk About Your Views On Chinese Prefabricated Constmentioning
confidence: 99%
“…The industry has not integrated the process of design, production, transportation, assembly and maintenance into an information platform, which may cause mismatched structural design, lack of qualified labor, low-quality production of prefabricated components, and higher transportation cost. Industry standard [45], [40], [33] X 12 Regulatory mechanism [8], [7], [42] X 13 TF BIM technology [17], [29], [32] X 21 Standardization [40], [33], [43] X 22 Technical talent [17], [7], [12], [ Management mode. PC promotion requires multi-participation management and deep cooperation among partners.…”
Section: Can You Talk About Your Views On Chinese Prefabricated Constmentioning
confidence: 99%
“…This questionnaire was distributed to 400 professionals (designers, manufacturers, and contractors). They are the main actors in the supply chain of PHP and have a significant influence on PP&C of PHP [11,13]. A total of 136 valid responses were obtained, including 42 from designers, 43 from manufacturers, and 51 from contractors.…”
Section: F23mentioning
confidence: 99%
“…Designers, manufacturers, and contractors involved in the PHP are the three main stakeholders in the supply chain [11,13]. For the contractor, the manufacturer is the supplier that provides prefabricated components.…”
Section: Cluster 3: External Environmentmentioning
confidence: 99%
“…Prefabricating buildings has long been considered a sustainable practice in the architecture, engineering, and construction (AEC) industries [1], and involves moving a partially finished building from a construction site into a controlled component factory [2]. Other terms related to prefabricated buildings include prefabrication [3], industrialized buildings [4], precast buildings [5], prefabrication techniques [6], prefabricated…”
Section: Introductionmentioning
confidence: 99%