Analysis of Ramp on Off Costs And Time Using the Earned Value Analysis (EVA) Method

Abstract: In the construction of a project, the contractor has problems where the project is delayed. Therefore, it is necessary to make a system that is made to control costs and time so as not to experience delays and losses. In this study, the control is carried out using earned value analysis which aims to control costs and time with BCWS, BCWP and ACWP, which then calculates the cost and time performance index to determine the estimated cost and time to complete the project. The results of this study show that at t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…Schedule Performance Index (SPI) compares the work's performed value and the planned work's value [11]. This calculation determines the efficiency of the project work implementation time.…”
Section: Performance Index Analysismentioning
confidence: 99%
See 1 more Smart Citation
“…Schedule Performance Index (SPI) compares the work's performed value and the planned work's value [11]. This calculation determines the efficiency of the project work implementation time.…”
Section: Performance Index Analysismentioning
confidence: 99%
“…The results of the SPI are then analyzed using the criteria in Table 2 Cost Performance Inder (CPI) is a cost efficiency factor issued by comparing the value of the work performed with the actual costs incurred in the same period [11]. This calculation is carried out to determine the cost efficiency of project work performance.…”
Section: Spi = Bcwp Bcwsmentioning
confidence: 99%