Analysis of Hydrogen Infrastructure for the Feasibility, Economics, and Sustainability of a Fuel Cell-Powered Data Center

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Solar PV Investment cost-$825/kW, Fixed Operating and Maintenance (O&M)-$9.5/kW/year Solar availability factor varies between 9-28% depending on location, and is estimated using Sandia's plane-of-array model and algorithms for solar-array trackers 1 for a fixed tilted, 1-axis tracking system and 2-axis tracking system, with an operational life of 20 years, and is shown in the merra2ools package For the low-cost scenario, Solar PV, CAPEX and OPEX battery systems were estimated from [19] and assume that the cost of PV will fall by 62% and battery costs will fall by 74.2%. We assume that the cost of wind will decrease by at least 31%, as for the last 10 years [20], as well as the estimates of fuel cell costs [21].…”
Section: Cost Technical Parametermentioning
confidence: 99%
“…Solar PV Investment cost-$825/kW, Fixed Operating and Maintenance (O&M)-$9.5/kW/year Solar availability factor varies between 9-28% depending on location, and is estimated using Sandia's plane-of-array model and algorithms for solar-array trackers 1 for a fixed tilted, 1-axis tracking system and 2-axis tracking system, with an operational life of 20 years, and is shown in the merra2ools package For the low-cost scenario, Solar PV, CAPEX and OPEX battery systems were estimated from [19] and assume that the cost of PV will fall by 62% and battery costs will fall by 74.2%. We assume that the cost of wind will decrease by at least 31%, as for the last 10 years [20], as well as the estimates of fuel cell costs [21].…”
Section: Cost Technical Parametermentioning
confidence: 99%