2011
DOI: 10.5345/jkic.2011.02.1.073
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works

Abstract: The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2011
2011
2022
2022

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 2 publications
(1 reference statement)
0
0
0
1
Order By: Relevance
“…또한, 공동주택의 공사비 가운데 소방공사 노무비의 비율은 약 50%를 상회하는 수준으로, 소방설비공사에 합리적이고 선진적인 노무생산성관리에 의한 인력투입 계획을 적용한다 면 안정적인 품질확보가 가능하다. 즉, 합리적인 공정계획과 관리를 통한 소방설비의 품질을 확보하기 위해서 생산성 연 구는 매우 필요하다 [6,7,8,9,10]. 19 Quality of major parts ○ ○ ◎ : correlation is significant at 0.01(both sides).…”
Section: 서 론 11 연구배경unclassified
“…또한, 공동주택의 공사비 가운데 소방공사 노무비의 비율은 약 50%를 상회하는 수준으로, 소방설비공사에 합리적이고 선진적인 노무생산성관리에 의한 인력투입 계획을 적용한다 면 안정적인 품질확보가 가능하다. 즉, 합리적인 공정계획과 관리를 통한 소방설비의 품질을 확보하기 위해서 생산성 연 구는 매우 필요하다 [6,7,8,9,10]. 19 Quality of major parts ○ ○ ◎ : correlation is significant at 0.01(both sides).…”
Section: 서 론 11 연구배경unclassified