Abstract:Based on the background of the Suzhou Metro Line 3 crossing the Line 1 operating tunnel, the finite element software MIDAS/GTS was used to perform 3D model and simulate the construction of the shield tunnel. The influence of shield tunnel penetration before and after strengthening on operating tunnels is studied. The research results show that the maximum settlement of the operating tunnel caused by underpass construction without reinforcement is 11.64mm, which exceeds the control value of 10mm, and deformatio… Show more
“…Yang et al [11] studied the effect of shield construction on the settlement of an existing subway tunnel. Zhang et al [12] carried out the reinforcement optimization design for the Metro Shield tunneling under the existing railway; Lv et al [13] studied the evaluation and treatment of the subway tunnel passing under the bridge at a short distance; Zhang [14] Studied the construction of a new subway tunnel to pass under the operating subway tunnel at a short distance; Yang and Wang [15] carried out a study on the settlement control of the tunnel passing through the subway station closely; Zhang et al [16] carried out the deformation analysis of the adjacent Metro Shield tunnel; Liao et al [17] studied the construction disturbance and control of subway tunnel passing through under the highway for a long distance. Most of the previous studies have investigated the effect of disturbance of a tunnel passing through a subway at a short distance by the numerical simulation [18][19][20][21].…”
With the large-scale development and utilization of underground space projects, the subway-led Rail Transit Project is developing vigorously, and the safety and stability of subway under passing existing projects have become a key issue for the future. In this paper, the deformation law of subway tunnel under the existing track is studied by using the method of ROCSCIENCE software and field measurement, which is based on the construction of a new double-tunnel shield-driven subway tunnel under the existing city of pile rapid track project. In the crossing area, the distance between the top of the tunnel and the pile foundation is 6.2 m and the distance between the tunnel and the existing track surface is 19.6 m. It is required that the settlement of track caused by the new tunnel construction should not exceed 2 mm. The results show that the settlement of the existing track is greatly influenced by the new tunnel without reinforcement and grouting, and the maximum settlement is more than 9.92 mm. The settlement of the existing track can be controlled to 1.93 mm by adjusting the construction parameters of the shield machine and grouting reinforcement at different stages during construction.
“…Yang et al [11] studied the effect of shield construction on the settlement of an existing subway tunnel. Zhang et al [12] carried out the reinforcement optimization design for the Metro Shield tunneling under the existing railway; Lv et al [13] studied the evaluation and treatment of the subway tunnel passing under the bridge at a short distance; Zhang [14] Studied the construction of a new subway tunnel to pass under the operating subway tunnel at a short distance; Yang and Wang [15] carried out a study on the settlement control of the tunnel passing through the subway station closely; Zhang et al [16] carried out the deformation analysis of the adjacent Metro Shield tunnel; Liao et al [17] studied the construction disturbance and control of subway tunnel passing through under the highway for a long distance. Most of the previous studies have investigated the effect of disturbance of a tunnel passing through a subway at a short distance by the numerical simulation [18][19][20][21].…”
With the large-scale development and utilization of underground space projects, the subway-led Rail Transit Project is developing vigorously, and the safety and stability of subway under passing existing projects have become a key issue for the future. In this paper, the deformation law of subway tunnel under the existing track is studied by using the method of ROCSCIENCE software and field measurement, which is based on the construction of a new double-tunnel shield-driven subway tunnel under the existing city of pile rapid track project. In the crossing area, the distance between the top of the tunnel and the pile foundation is 6.2 m and the distance between the tunnel and the existing track surface is 19.6 m. It is required that the settlement of track caused by the new tunnel construction should not exceed 2 mm. The results show that the settlement of the existing track is greatly influenced by the new tunnel without reinforcement and grouting, and the maximum settlement is more than 9.92 mm. The settlement of the existing track can be controlled to 1.93 mm by adjusting the construction parameters of the shield machine and grouting reinforcement at different stages during construction.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.