2019
DOI: 10.1556/1848.2019.0032
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of construction cost prediction studies – global perspective

Abstract: It is well known that the civil engineering constructions are subjected to cost risk and time overruns. The uncertainties of the cost of construction many times result in disputes among stakeholders. The recent cost fluctuation in sand price in Tamil Nadu is a good example of time and cost overruns. There are too many models developed to predict the cost of construction by using different parameters and tools. The objectives of this research are to analyse the importance of research in this field, the countrie… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 18 publications
0
2
0
Order By: Relevance
“…The first stage of synthesizing the 152 literatures is dividing them according to 2 classifications, literatures from the developed countries and literatures from developing countries as presented in Table 2 & 3. (Afzal et al, 2019;Anish et al, 2019;Bhangale, 2016;Chandramohan et al, 2012;Cindrela Devi & Ananthanarayanan, 2017;Ghumare et al, 2019;Kant, 2018;Muthu Venkata Sekar & Mahalakshmi, 2018;Pai et al, 2018;Raju et al, 2017;Shaktawat & Vadhera, 2017;Shanmuganathan & Baskar, 2015;Sharma et al, 2020;Sharma & Goyal, 2019;Shrivastava et al, 2019;Subramani & Sivakumar, 2018;Velumani & Nampoothiri, 2019;Venkateswaran & Murugasan, 2017;Wanjari & Dobariya, 2016) Malaysia 20 (Abdullah et al, 2018;Afzal et al, 2019;Akram et al, 2017;Asmi et al, 2013;Azis et al, 2013;Hameed Memon et al, 2014;Haslinda et al, 2018;Ismail et al, 2013;Karunakaran et al, 2018;Liew et al, 2019;Memon et al, 2011Memon et al, , 2012Rahman et al, 2013;C. Ramanathan et al, 2012;C.…”
Section: Synthesis Of Resultsmentioning
confidence: 99%
“…The first stage of synthesizing the 152 literatures is dividing them according to 2 classifications, literatures from the developed countries and literatures from developing countries as presented in Table 2 & 3. (Afzal et al, 2019;Anish et al, 2019;Bhangale, 2016;Chandramohan et al, 2012;Cindrela Devi & Ananthanarayanan, 2017;Ghumare et al, 2019;Kant, 2018;Muthu Venkata Sekar & Mahalakshmi, 2018;Pai et al, 2018;Raju et al, 2017;Shaktawat & Vadhera, 2017;Shanmuganathan & Baskar, 2015;Sharma et al, 2020;Sharma & Goyal, 2019;Shrivastava et al, 2019;Subramani & Sivakumar, 2018;Velumani & Nampoothiri, 2019;Venkateswaran & Murugasan, 2017;Wanjari & Dobariya, 2016) Malaysia 20 (Abdullah et al, 2018;Afzal et al, 2019;Akram et al, 2017;Asmi et al, 2013;Azis et al, 2013;Hameed Memon et al, 2014;Haslinda et al, 2018;Ismail et al, 2013;Karunakaran et al, 2018;Liew et al, 2019;Memon et al, 2011Memon et al, , 2012Rahman et al, 2013;C. Ramanathan et al, 2012;C.…”
Section: Synthesis Of Resultsmentioning
confidence: 99%
“…With regard to the costs relating to new construction interventions, numerous studies have been carried out with the aim of estimating the monetary amounts necessary for the realization of the project, both in terms of realization ex-novo [6][7][8][9][10] that of reconstruction following seismic events [11][12][13][14][15][16]. The process of defining a project involves further categories of costs whose analysis and estimate allows one to provide a more comprehensive economic framework.…”
Section: Background On the Construction And Refurbishment Costs And Tmentioning
confidence: 99%