2020
DOI: 10.1016/j.egyr.2020.01.017
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of application of back-to-back HVDC system in Tomsk electric power system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
5
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9

Relationship

3
6

Authors

Journals

citations
Cited by 11 publications
(5 citation statements)
references
References 8 publications
0
5
0
Order By: Relevance
“…The detailed description and different performance parameters, such as the reaction time and execution time distribution of program operation via the microcontrollers used in the HRTSim, are shown in the work of Andreev et al [23]. The reliability of the information obtained via HRTSim has been confirmed through the extensive laboratory studies and validations with field measurements [26][27]. The generic structure of HRTSim is shown in Fig.…”
Section: A Hybrid Modeling Of Electric Power Systemmentioning
confidence: 94%
“…The detailed description and different performance parameters, such as the reaction time and execution time distribution of program operation via the microcontrollers used in the HRTSim, are shown in the work of Andreev et al [23]. The reliability of the information obtained via HRTSim has been confirmed through the extensive laboratory studies and validations with field measurements [26][27]. The generic structure of HRTSim is shown in Fig.…”
Section: A Hybrid Modeling Of Electric Power Systemmentioning
confidence: 94%
“…Today EPS of the Tomsk region consists of asynchronously operating northern and southern parts, the operational section between which passes through the transit of 220 kV with length of 797.3 km (including the territory of the united power system (UPS) of Siberia -785.7 km) between SS Tomskaya (UPS of Siberia) -SS Volodino -SS Parabel -SS Sovetsko-Sosninskaya -Nizhnevartovskaya GRES (UPS of Ural) [45]. In normal operating state, the operational section is located on the area between SS Vertikos -SS Parabel.…”
Section: Validation Of Transient Stability Calculations In Case Of Power System Interconnectionmentioning
confidence: 99%
“…Power system [1][2][3][4][5] networks composed of control areas that have been interlinked through transmission lines termed as tielines. Every area maintains a single nominal frequency across its geographical territory, which is made up of either a group of generators or a single generator.…”
Section: Introductionmentioning
confidence: 99%