IABSE Congress, Chicago 2008: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure 2008
DOI: 10.2749/222137908796294270
|View full text |Cite
|
Sign up to set email alerts
|

Analysis for Initial Equilibrium Condition and Erection Stages of Sorok (Self-Anchored Suspension) Bridge

Abstract: <p>This paper presents analysis and construction method of the Sorok (self-anchored suspension) bridge that is currently under construction in the Sorok Island, CheonllaNamdo, Korea and expected to be completed in 2008. To find the optimum initial equilibrium condition of self- anchored suspension bridge, the force of main cable and hanger are developed together with minimizing vertical camber of stiffening girder. Erection stage analyses are carried out for both hanger-pulling method and girder jack-dow… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2009
2009
2009
2009

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 1 publication
0
0
0
Order By: Relevance