Analysis and monitoring on jacking construction of continuous box girder bridge

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 16 publications
(8 citation statements)
references
References 7 publications
0
4
0
Order By: Relevance
“…e orenfeldt hardening model provided by the software is adopted for the compression model. e compressive strengths of the concrete column and the girdling beam are 28.5 MPa and 31.7 MPa, respectively, according to a real engineering project [11,12]. e tensile model adopts the ideal failure model, and the input parameter is the 2.01 MPa tensile strength of concrete.…”
Section: Materials Properties Of the Concrete Elementmentioning
confidence: 99%
See 1 more Smart Citation
“…e orenfeldt hardening model provided by the software is adopted for the compression model. e compressive strengths of the concrete column and the girdling beam are 28.5 MPa and 31.7 MPa, respectively, according to a real engineering project [11,12]. e tensile model adopts the ideal failure model, and the input parameter is the 2.01 MPa tensile strength of concrete.…”
Section: Materials Properties Of the Concrete Elementmentioning
confidence: 99%
“…e girdling beam is a common form of jacking support system, it is also an important component as the role of force system conversion in the process of jacking, the stress condition of the girder under load is very complex, and its structure safety is directly related to the safety of the whole bridge jacking process [10][11][12]. At present, there are a few studies on the structural performance of girdling beams, and the solutions to some problems are only based on experience or refer to other related projects [13].…”
Section: Introductionmentioning
confidence: 99%
“…Te standard method of bearing replacement is to jack up the main girder, transfer the load from the bearing to a jack, subsequently replace the bearing, and ultimately transfer the load from the jack back to the bearing by dropping the girder [3]. Te synchronization of the vertical displacement of each girder is an essential indicator in monitoring operations to prevent any potential harm to the main girder during construction [4].…”
Section: Introductionmentioning
confidence: 99%
“…Bridge construction methods can be divided into many types, including cantilever construction (basket construction method), support construction, hoisting construction, jacking construction method, rotation construction, etc [1][2][3]. Bridge construction methods are usually chosen based on factors such as local topography, bridge usage, and construction costs.…”
Section: Introductionmentioning
confidence: 99%