2021
DOI: 10.1088/1755-1315/804/2/022059
|View full text |Cite
|
Sign up to set email alerts
|

Analysis and application of stress distribution in 24-m high bench loosening blasting with axially uncoupled charge structure in Barun Open-pit Mine

Abstract: The Barun Open-pit Mine has formed a 2-benches or 4-benches parallel mining condition due to the steep end-slope mining. In the enlarging process, the operation safety conditions of equipment are poor. In order to improve the operating conditions, increase the efficiency of slope enlarging, and reduce the mining cost, a technical solution is proposed that uncoupling the top air-deck charge structure by loosening blasting in the 24-m high bench. Based on the Holmquist-Johnson-Cook (HJC) constitutive model, the … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
references
References 4 publications
0
0
0
Order By: Relevance