Analysing Delay Impact From Potential Risk Factors on Project Delivery of Oil and Gas Pipeline: A Case Study in Iraq

Abstract: The aim of this paper is to present the design and specifications of an integrated Delay Analysis Framework (DAF), which could be used to quantify the delay caused by the Risk Factors (RFs) in Oil and Gas Pipelines (OGPs) projects in a simple and systematic way. The main inputs of the DAF are (i) the potential list of RFs in the projects and their impact levels on the projects and the estimated maximum and minimum duration of each task. Monte Carlo Simulation integrated within @Risk simulator was the key proce… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 24 publications
(37 reference statements)
0
0
0
Order By: Relevance
“…The literature review has highlighted some of the RAMs in OGPs. Such as increasing safety awareness and authority of the project managers; reducing the complexity of the process; improving communications; changing the existing strategies; improving budget planning; extending the schedule and scope reduction (Kraidi et al, 2021a).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The literature review has highlighted some of the RAMs in OGPs. Such as increasing safety awareness and authority of the project managers; reducing the complexity of the process; improving communications; changing the existing strategies; improving budget planning; extending the schedule and scope reduction (Kraidi et al, 2021a).…”
Section: Literature Reviewmentioning
confidence: 99%