Analisis Rugi Daya Dan Rekonsiliasi Energi Jaringan Distribusi Tegangan Menengah 20 Kv Pada Penyulang Nijang

Abstract: This study aims to determine the loss / power loss in the nijang feeder through the energy reconciliation process, simulation of the ETAP 12.6 program, and manual calculations. The benefits of this research can be used as a basis for consideration of the improvement efforts that should be carried out to minimize power losses in the medium voltage distribution network of Nijang feeders. The method used is quantitative research method because it takes data from the measurement of the transaction point which is t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
1

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
0
0
1
Order By: Relevance
“…Riset terdahulu merumuskan penyusutan tegangan( voltage drop) serta rugi-rugi energi( losses) memakai ETAP di penyulang gardu induk Bandung selatan. Rugi-rugi energi serta rekonsiliasi tenaga jaringan distribusi tegangan menengah 20 kV pada penyulang Nijang [6]. Akibat sumber energi terdistribusi terhadap profil tegangan serta rugi energi pada penyulang Bantul [7].…”
Section: Iunclassified
“…Riset terdahulu merumuskan penyusutan tegangan( voltage drop) serta rugi-rugi energi( losses) memakai ETAP di penyulang gardu induk Bandung selatan. Rugi-rugi energi serta rekonsiliasi tenaga jaringan distribusi tegangan menengah 20 kV pada penyulang Nijang [6]. Akibat sumber energi terdistribusi terhadap profil tegangan serta rugi energi pada penyulang Bantul [7].…”
Section: Iunclassified