An overview on mathematical programming approaches for the deterministic unit commitment problem in hydro valleys

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
22
0
1

Year Published

2017
2017
2022
2022

Publication Types

Select...
5
4
1

Relationship

0
10

Authors

Journals

citations
Cited by 68 publications
(23 citation statements)
references
References 104 publications
0
22
0
1
Order By: Relevance
“…Hydro units are in fact entire hydro valleys, i.e., a set of connected reservoirs, turbines and pumps that influence each other through flow constraints. When the hydro component is significant UC is often denoted as HUC; this may make the problem significantly more difficult, as the recent survey [497] highlights. Turbines release water from uphill reservoirs to downhill ones generating energy, pumps do the opposite.…”
Section: Hydro Unitsmentioning
confidence: 99%
“…Hydro units are in fact entire hydro valleys, i.e., a set of connected reservoirs, turbines and pumps that influence each other through flow constraints. When the hydro component is significant UC is often denoted as HUC; this may make the problem significantly more difficult, as the recent survey [497] highlights. Turbines release water from uphill reservoirs to downhill ones generating energy, pumps do the opposite.…”
Section: Hydro Unitsmentioning
confidence: 99%
“…The short-term optimization approach follows the hours-ahead to day-ahead time horizon. In power system operations, unit commitment is one of the central approaches [6][7][8][9][10][11]. For achieving accuracy in testing, all daily operations and market clearing is done in advance.…”
Section: Introductionmentioning
confidence: 99%
“…For instance what will be the new role for large centralized generation assets such as nuclear, thermal or hydro generation? It also becomes of interest to examine how classical energy management questions, such as unit-commitment (e.g., [1,2]), scheduling maintenance of large power plants or cascaded reservoir management (e.g., [3,4]) should evolve to account for this new context. Needless to say, these classical management questions are already difficult on their own without considering a potential interaction with micro-grids.…”
Section: Introductionmentioning
confidence: 99%