2012
DOI: 10.1016/j.ress.2012.04.004
|View full text |Cite
|
Sign up to set email alerts
|

An overview of the recent advances in delay-time-based maintenance modelling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
125
0
4

Year Published

2014
2014
2022
2022

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 191 publications
(129 citation statements)
references
References 99 publications
0
125
0
4
Order By: Relevance
“…However, since there will be fluctuation due to noise at the measurement temperature and measurement time, it can be estimated by the width of the derivative function of the step response. The width of the function is obtained by the second order moment [3]. The two methods of finding the rise time are named as 'direct difference' and 'derivative width', respectively, hereafter.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…However, since there will be fluctuation due to noise at the measurement temperature and measurement time, it can be estimated by the width of the derivative function of the step response. The width of the function is obtained by the second order moment [3]. The two methods of finding the rise time are named as 'direct difference' and 'derivative width', respectively, hereafter.…”
Section: Methodsmentioning
confidence: 99%
“…Equipment management is performed by corrective maintenance (CM) and by periodic preventive maintenance (PM) before the failure [1][2][3][4][5][6][7]. The development of the internet of things (IoT) technology allows even low-cost equipment to send sensor data to the cloud, changing the paradigm of equipment management [7].…”
Section: Introductionmentioning
confidence: 99%
“…Maintenance with the time delay analysis was first introduced in 1973 by Christer and Wang [9] and Wang [10][11][12]. It continues to develop to be applied in many industries [13][14][15].…”
Section: Time Delaymentioning
confidence: 99%
“…A defect can be identified if the inspection is carried out during the delay-time stage. Many inspection and PM models, especially successful case studies based on the two-stage failure process have been reported with actual applications in industry [18,19].…”
Section: Introductionmentioning
confidence: 99%