2014
DOI: 10.1109/tsm.2014.2342493
|View full text |Cite
|
Sign up to set email alerts
|

An Order Fulfillment Model With Periodic Review Mechanism in Semiconductor Foundry Plants

Abstract: In today's globalization competition, manufacturing firms are using an order fulfillment system to give available-topromise (ATP) capacity efficiently. An ordinary order fulfillment system will plan capacity based on forecasts and assign ATP quotas to incoming orders. Its basic idea is to enhance capacity utilization and avoid poor customer service. However, in the semiconductor industry, demand is highly volatile, and a maketo-order (MTO) manufacturer often runs the risk of cancelled committed demands. In thi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
11
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 12 publications
(11 citation statements)
references
References 25 publications
(32 reference statements)
0
11
0
Order By: Relevance
“…Ponsignon and Mӧnch (2012) applied heuristic approaches for solving master planning problems by taking demand and capacity constraints into account; Ponsignon and Mӧnch (2014) also devised two heuristic approaches, a genetic algorithm and a rule-based assignment procedure, for master planning in the semiconductor manufacturing and evaluated the performance of them while considering demand and execution uncertainty. Chiang and Hsu (2014) proposed a master planning model within an integrated order fulfillment system for a MTO foundry fab to maximize corporate profit. The above studies, however, concentrated only on capacity allocation and neglected the examination of environmental issues.…”
Section: Literature Reviewmentioning
confidence: 99%
See 3 more Smart Citations
“…Ponsignon and Mӧnch (2012) applied heuristic approaches for solving master planning problems by taking demand and capacity constraints into account; Ponsignon and Mӧnch (2014) also devised two heuristic approaches, a genetic algorithm and a rule-based assignment procedure, for master planning in the semiconductor manufacturing and evaluated the performance of them while considering demand and execution uncertainty. Chiang and Hsu (2014) proposed a master planning model within an integrated order fulfillment system for a MTO foundry fab to maximize corporate profit. The above studies, however, concentrated only on capacity allocation and neglected the examination of environmental issues.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The other input of master planning is from demand planning (e.g., Chiang and Hsu (2014)). The demand forecast of a foundry company is usually based on regional sales data and requires sales managers to visit customers frequently.…”
Section: Modelsmentioning
confidence: 99%
See 2 more Smart Citations
“…Ponsignon and Mӧnch (2012) applied heuristic approaches for solving master planning problems by taking demand and capacity constraints into account; Ponsignon and Mӧnch (2014) also devised two heuristic approaches, a genetic algorithm and a rule-based assignment procedure, for master planning in the semiconductor manufacturing and evaluated the performance of them while considering demand and execution uncertainty. Chiang and Hsu (2014) proposed a master planning model within an integrated order fulfillment system for a MTO foundry fab to maximize corporate profit. The above studies, however, concentrated only on capacity allocation and neglected the examination of environmental issues.…”
Section: Literature Reviewmentioning
confidence: 99%