2013 IEEE International Conference of IEEE Region 10 (TENCON 2013) 2013
DOI: 10.1109/tencon.2013.6718854
|View full text |Cite
|
Sign up to set email alerts
|

An optimized relay handover algorithm in TD-LTE along high-speed railway

Abstract: Handover (HO) is one of the key procedures, which ensures user equipment (UE) moving smoothly in long term evolution (LTE) systems. Generally, hard handover has a high outage probability and is relatively simple, but when the velocity of UE is high, the procedure may be unreliable, especially for VoIP service. In the special scenario high-speed railway, network deployment is known and an optimized relay algorithm could be applied according to information already known, such as cell deployment and direction of … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 11 publications
0
2
0
Order By: Relevance
“…Therefore, it is necessary to develop an optimal route structure for the railway network at the planning level. Nevertheless, the existing high-speed railway network is not fully optimized, due to a lack of knowledge on developing high-speed railways [7]. Therefore, the motivation of this study was to propose an optimization framework for high-speed railway network planning.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Therefore, it is necessary to develop an optimal route structure for the railway network at the planning level. Nevertheless, the existing high-speed railway network is not fully optimized, due to a lack of knowledge on developing high-speed railways [7]. Therefore, the motivation of this study was to propose an optimization framework for high-speed railway network planning.…”
Section: Introductionmentioning
confidence: 99%
“…where C O is the operating cost of the line, C 1 is the construction and maintenance costs of the high-speed railway lines, C 2 is the construction and maintenance costs of a high-speed station, and C 3 is the purchase and maintenance costs of a high-speed train. We can calculate C 1 , C 2 , and C 3 , respectively, according to Equations ( 5)- (7).…”
mentioning
confidence: 99%