2009
DOI: 10.1080/00207720902974645
|View full text |Cite
|
Sign up to set email alerts
|

An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
11
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 19 publications
(11 citation statements)
references
References 15 publications
0
11
0
Order By: Relevance
“…Wee et al (2007) established optimal inventory model for items with imperfect quality and shortage backordering. Wang et al (2009) developed an optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length. Sarkar and Moon (2011) developed an economic production quantity (EPQ) model with inflation in an imperfect production system.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Wee et al (2007) established optimal inventory model for items with imperfect quality and shortage backordering. Wang et al (2009) developed an optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length. Sarkar and Moon (2011) developed an economic production quantity (EPQ) model with inflation in an imperfect production system.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Note that in the above calculations, we rewrite expression (12) as (12#). This is due to the fact that when j nÀ1 \ X Ã iÀ1 4j n and n4j4k, there is no uniform expression of Et ij since Et in =…”
Section: Formulation Of the Modelmentioning
confidence: 99%
“…Liao et al, [16] integrated maintenance and production programs with EPQ model considered the impact of restoration action such as imperfect repair, rework and PM on the damage of a deteriorating production system. Wang et al, [25] developed an integrated model in considering the situations of an imperfect process with imperfect maintenance, two types of out-of-control states and inspection time for the joint determination of both EPQ and PM level.…”
Section: Introductionmentioning
confidence: 99%